© 2018 SP Stalls & Storage           Hours of Operations         Products                        Services            About Us

Main Branch

8046 Inadale Drive

Mount Brydges On

N0L 1W0

519-264-1494 p

888-856-9765 f

GTA Branch

551 Commercial Street- Suite #63

Milton, On

L9T 4R9

Mon-Fri 8:30am to 5pm

Sat & Sun - Closed

Installation Guide
Supply Only
Quick Ship
  • Facebook Social Icon
  • Twitter Social Icon
  • Google+ Social Icon
  • Instagram Social Icon
  • LinkedIn Social Icon
  • YouTube Social  Icon
  • Pinterest Social Icon
  • ryanpg

How To Purchase Toilet Partitions?


How do I purchase new toilet partitions?

Simple question right?.. Just pick up the phone call SP Stalls and say...


I would like to purchase a set of 4 bathroom stalls. When can I pick them up? When can they get delivered? Are toilet partitions easy to install? Do you have installers? How do I pay?.....

Seems to be a lot of questions and unknowns for anyone who has not bought bathroom partitions before through a professional sales agent. And the truth is, there is a lot of questions to ask. Ask away, questions are great building blocks during the beginning stage of your toilet partition purchase. Every question and concern is valid is noted and there is no such thing as a bad question.


STEP #1: CREATE A FLOOR PLAN OR USE EXISTING LAYOUT


The first step in purchasing new toilet partitions is knowing your layout. We can issue you a price and quotation solely based of your current layout or desired layout. I mention desired because it is very possible during a bathroom renovation to add or move toilet bowls. Re-configuring your bathroom entirely is not uncommon and something we at SP Stalls would love to help you re configure.


STEP #2: FILL OUT A PRICE REQUEST SHEET OR CALL US WITH YOUR LAYOUT


Email us your layout configuration Pick up the phone and call one of our professional estimators to discuss your layouts and desired materials. A nice brief conversation can cover everything and at that point we can enter your future bathroom design into our system for pricing and send it back via email. (Measurements are not needed at this point, if you have them that is great, but it is not mandatory at pricing stage)


STEP #3: ACCEPT QUOTATION AND MAKE PURCHASE


You have now received a price on your new toilet partitions. You have decided that it is in your budget to replace your old bathroom stalls and you would to go ahead with the new order. Perfect, Let us take it from here, your work is done and you have now purchased new toilet partitions for your commercial washroom.


We ask new customers for 50% up front for the production of the your new partitions and the other 50% when the job is complete. Returning customers and tender jobs required just a purchase order to get this step started.


STEP #4: INSTALLATION DATE AND COMPLETION


the customer and SP Stall work together and finalize an installation date for the new toilet partitions. arranging the freight and delivery is all SP Stalls scope of work, you the customer just say a date and we will work with out ops team and make it happen.


STEP #5: TOILET PARTITION INSTALLATION IS COMPLETE


Title says it all, your new partition are installed and complete all there is left to do now is take out your phone, get yourself some pictures and post them on your social media pages and show your friends. New toilet partitions have a huge impact of the look and feel to your commercial washroom. Its the first thing you see when you walk into a bathroom. So make an impression and choose the design and build team leading the industry since 2004. SP Stalls & Storage your division 10 leaders for Lockers and Washroom equipment

New Toilet Partitions

.




2 views